From 2018 to 2019, BBH worked with Monadelphous Mongolia on electrical installation works at Material Handling System deploying 70 personnel and completing various works including:
• Installation of cable trays & supports
• Cable pulling
• Termination and testing
• Installation of power and control panels
• Installation of secondary circuits
• Installation of fire extinguishing and detection systems
• Installation of various switches and detectors