MHS#2 Above Ground SMP E&I COS Building Oyu Tolgoi mine site, 2022-2024

MHS#2 Above Ground SMP E&I COS Building Oyu Tolgoi mine site, 2022-2024

From December 2022 up to date – Client: Monadelphous Mongolia
Sites: 
E&I of Oyu Tolgoi Underground Mine’s Material Handling System (MHS#2) and extension to COS Building 
Number of personnel on the project: 

  • Supervisors:         2
  • Team Leaders:     8
  •  Electricians:         60

Works: 
In compliance with all relevant standards (including C2 Electrical Safety Standard) and the design drawings provided, we undertook the following works involving high and low voltage systems: 

  • Installation cable trays and supports
  • Cable pulling 
  • Cable termination, checking and testing
  • Installation of power and control panels
  • Installation of secondary circuits
  • Installation of fire extinguishing and alarm systems
  • Installation of various switches and detectors

For this project, BBH deployed some 100 personnel onsite including 2 supervisors, 8 team leaders and up to 100 electricians.


MHS#2 Above Ground SMP E&I COS Building Oyu Tolgoi mine site, 2022-2024