From December 2022 up to date – Client: Monadelphous Mongolia
Sites:
E&I of Oyu Tolgoi Underground Mine’s Material Handling System (MHS#2) and extension to COS Building
Number of personnel on the project:
- Supervisors: 2
- Team Leaders: 8
- Electricians: 60
Works:
In compliance with all relevant standards (including C2 Electrical Safety Standard) and the design drawings provided, we undertook the following works involving high and low voltage systems:
- Installation cable trays and supports
- Cable pulling
- Cable termination, checking and testing
- Installation of power and control panels
- Installation of secondary circuits
- Installation of fire extinguishing and alarm systems
- Installation of various switches and detectors
For this project, BBH deployed some 100 personnel onsite including 2 supervisors, 8 team leaders and up to 100 electricians.